WIP report for subcontractors: work in progress on every job, each month

Each job’s value, cost to date, cost to complete, percentage complete and over or under claimed, from your own claims, costs and budgets, kept month by month.

The bank, the surety and your accountant ask for a WIP schedule every month. You build it in a spreadsheet from four other spreadsheets.

99%
By hand
14 h 30 min
In Excel
9 h
In YourCA
12 min
Saved
14 h 18 min

Estimate for a 6-month electrical job with 10 people on it, each month, on each job. Set your own job.

The risk it heads off

  • A job is over claimed and the bank or surety finds it before you do.Shows each job over or under claimed, with over in red, every time you open it.
  • The figures you gave the bank last month cannot be produced again.Keeps a snapshot of each month, saved by you or by YourCA at month end.

Step by step

Send the bank your WIP schedule: estimated minutes for each step, each month, on each job
StepBy handExcelYourCAWhat YourCA does
Pull each job’s contract value and approved variations30 min20 min0 minReads the contract sum and every approved variation, and shows pending ones beside it.
Pull each job’s cost to date and budget45 min30 min0 minReads the same costs and budget as Margin: labour, super, orders, supplier invoices and typed costs.
Work out percentage complete, earned and over or under claimed40 min20 min0 minWorks each one out by cost, the method named on the page.
Lay it out for the bank and keep the month30 min20 min2 minDownloads it on your letterhead with a cover, and keeps a snapshot of each month.
Total, each month, on each job145 min90 min2 min

How to do it in YourCA

Questions subbies ask

Does the WIP report meet an accounting standard?
It names its method, percentage complete by cost, and claims no standard. Your accountant keeps their own adjustments.