Time saved
The hours a subbie gets back on one job
Set your job, then open any row to see each step.
Estimated time saved on this job
391 hours
- 441 h by hand
- 356 h in Excel
- 50 h in YourCA
- 89% less time
Win the job
Price and send the quoteeach quote that wins the jobBy hand8 h 20 minExcel6 h 10 minYourCA1 h 25 min6 h 55 min saved · 83% less time
The builder compares quotes. You build one from nothing, often at night, for a job you may not win. When you do win, the priced lines get typed again into a claim schedule.
The risk it heads off
- An exclusion left off the quote turns into free work on site.Your standard exclusions and clarifications go on every quote.
- The builder accepts an old revision of your quote.An issued quote is frozen. A change raises a new revision, so each one names one price.
- The claim schedule is retyped after you win and never adds up.The schedule comes from the accepted quote, to the cent.
Price and send the quote: every step on its own pagePrice and send the quote: estimated minutes for each step, each quote that wins the job Step By hand Excel YourCA What YourCA does Price each line from labour, materials and hire 120 min 90 min 45 min Works out the unit rate, the section totals and the margin as you type. Look up merchant prices 45 min 40 min 10 min Search your merchant price lists from inside the line. The price fills the material cost. Ask merchants to price the fixtures 30 min 30 min 5 min Writes the request and a supply-only schedule. It opens in your own email. Write the exclusions and conditions 30 min 20 min 3 min Pulls in the term sets you saved once. Price lines you have priced before 45 min 30 min 5 min Save a line once, build-up and all. Add a copy to any quote in one press. Look up the margin you gave this builder last time 10 min 5 min 1 min Shows the margin your last quote to the same builder used. One press uses it. Lay the quote out on your letterhead 40 min 30 min 2 min One press makes the document from the same totals as the screen. Revise it when the builder asks 60 min 45 min 10 min Makes a new revision and keeps the old one. The totals stay right. Check what changed between two revisions 30 min 20 min 2 min Lays two revisions side by side: each line, what was added, removed or changed, and the difference in the price. Type the priced lines into a claim schedule after you win 90 min 60 min 2 min Accept turns the priced lines into your contract value schedule. Total, each quote that wins the job 500 min 370 min 85 min Walk the site before you priceeach job you walk and priceBy hand2 h 40 minExcel2 h 20 minYourCA21 min2 h 19 min saved · 87% less time
The builder sends drawings. You walk the site to see what they do not show, with a notepad, a marked-up print and a camera roll. Back at the desk it all gets sorted and typed again.
The risk it heads off
- A note from the site walk never makes it onto the quote, and the work it flagged is done for free.A note goes on the quote in one press, and the walk shows which notes are already there.
- The builder disputes how the site looked when you priced it.The walk is frozen once the quote is accepted, with each photo pinned where it was taken.
Walk the site before you price: every step on its own pageWalk the site before you price: estimated minutes for each step, each job you walk and price Step By hand Excel YourCA What YourCA does Write up the site walk notes so somebody else can read them 30 min 25 min 5 min You write or draw on the tablet as you walk. The notes are already typed and kept with the job. Mark up the drawings and scan them back in 30 min 30 min 5 min Opens any tender drawing as its own page to draw on, at the revision on your register. Measure runs off the drawings with a scale rule 25 min 25 min 5 min Set the scale off one dimension you know. The ruler gives the length of any line you draw. Sort the photos and work out where each was taken 30 min 25 min 2 min Each photo is filed in Tender photos and pinned on the drawing where you stood. Type the notes into the quote as lines and exclusions 20 min 15 min 3 min Press a note and Add to the quote. It goes on the draft as a line, an exclusion or a clarification. Put the walk in one document for the quote file 25 min 20 min 1 min Download gives the notes, the marked drawings and the photos as one PDF on your letterhead. Total, each job you walk and price 160 min 140 min 21 min Measure quantities off the drawingseach job you priceBy hand3 h 35 minExcel2 h 45 minYourCA20 min3 h 15 min saved · 91% less time
The builder sends a set of drawings and a date. You print them, run a scale rule over every room, add it up on a calculator and type the totals into the quote. When a revision lands you do it again.
The risk it heads off
- A void is left in the area, or a room is counted twice, and the price is wrong on every line it feeds.Every shape sits on the sheet in its layer colour, cut outs take their area away, and each layer shows how many shapes it holds.
- A quantity changes on the drawing and the quote still carries the old one.A line sent from a layer follows it while the quote is a draft, and says Typed once somebody types over it.
Measure quantities off the drawings: every step on its own pageMeasure quantities off the drawings: estimated minutes for each step, each job you price Step By hand Excel YourCA What YourCA does Measure each room and run off the drawings with a scale rule 90 min 70 min 8 min Set the scale once per sheet, then click round each room or area, or along each run. The figure shows as you draw. Add up the rooms and take out the voids 30 min 20 min 1 min Each layer adds its shapes on every sheet, and a cut out takes its area away. Count the fittings sheet by sheet 20 min 20 min 5 min Tap each fitting with Count. The layer keeps the tally across every sheet. Work out wall areas from runs and heights 20 min 10 min 2 min Give a length layer its wall height and it gives square metres. Type the quantities into the quote, and again after a change 25 min 15 min 2 min Send a layer to the quote. The line follows the drawing until you type over it. Put the marked sheets in the quote file 20 min 20 min 1 min Download gives the quantities and each sheet with its shapes on, on your letterhead. Set up the colour, symbol and waste of each layer again on the next job 10 min 10 min 1 min Save a layer as a tool once. On the next job it is one press from My tools. Total, each job you price 215 min 165 min 20 min
Before you start
Read the subcontracteach contractBy hand6 h 30 minExcel6 h 25 minYourCA36 min5 h 54 min saved · 91% less time
The builder has a contracts administrator who wrote the contract. You sign it, and the claim day, notice bars and retention terms in it decide what you get paid.
The risk it heads off
- A notice time bar you never read kills a variation or delay claim later.Lists each time bar with the clause behind it, before you sign.
- Pay-when-paid or uncapped liquidated damages slip in unread.Flags the clauses that move risk onto you, each with its clause.
- Your claim day, retention and payment terms get typed in wrong.The six commercial terms are read from the contract, each with its clause.
Read the subcontract: every step on its own pageRead the subcontract: estimated minutes for each step, each contract Step By hand Excel YourCA What YourCA does Read the contract front to back for risk 240 min 240 min 20 min Reads the whole contract and lists each risk with the clause behind it. You read the list. Find the claim day, notice periods, retention and payment terms 60 min 60 min 5 min Records each term with its clause and exact words. A term it cannot cite stays blank. Write the pushback letter 60 min 60 min 10 min Drafts the letter and a marked-up copy for you to edit and send. Put every obligation date in your calendar 30 min 25 min 1 min Every date goes on the job calendar and into your own calendar. Total, each contract 390 min 385 min 36 min Write the SWMSeach SWMSBy hand11 h 20 minExcel9 h 40 minYourCA1 h 58 min9 h 22 min saved · 83% less time
The builder asks for a SWMS before you start. You write it from a blank template for every job, then the crew signs it on paper.
The risk it heads off
- The safety officer sends your SWMS back and the crew waits at the gate.Each high risk task must be answered, and the risk ratings stay consistent page to page.
- A rating drops two bands on the strength of a hard hat.Warns when the controls do not support the lower rating.
Write the SWMS: every step on its own pageWrite the SWMS: estimated minutes for each step, each SWMS Step By hand Excel YourCA What YourCA does Write the steps, hazards and controls 180 min 150 min 30 min Type the tasks in your own words. YourCA drafts the steps, hazards and controls. Rate each risk 20 min 20 min 5 min Rates each one on the risk matrix as you pick likelihood and consequence. Check the high risk work categories 15 min 15 min 3 min Asks each high risk question. The statement cannot be issued while one is open. Start the next job from this one 60 min 45 min 5 min Copies a past SWMS or fills in your SWMS template. Job facts start blank. Fill the site, supervisor and emergency details 15 min 10 min 1 min Fills them from the job team and the builder’s contact. You check them. Write the rescue plan 20 min 20 min 5 min Drafts it for the harness, trench or confined space work in your tasks. You fit it to the gear on site. Collect crew sign-on 30 min 30 min 10 min Records how each worker signed, on the phone or on paper. Total, each SWMS 340 min 290 min 59 min Send the prestart packeach jobBy hand3 h 50 minExcel2 h 55 minYourCA16 min3 h 34 min saved · 93% less time
The builder will not let you on site until the pack is complete. You dig the same papers out of email and folders for every job, and send them again when they ask.
The risk it heads off
- You start work with no signed work order, then cannot claim for it.The pack shows the signed work order as missing until you add it.
- An expired certificate of currency gets the crew turned away.Warns 30 days before each insurance expires.
- The pack goes in with a gap nobody noticed.The front page lists what is missing as clearly as what is in.
Send the prestart pack: every step on its own pageSend the prestart pack: estimated minutes for each step, each job Step By hand Excel YourCA What YourCA does Find insurances, licences and company papers 60 min 45 min 5 min Holds them once in your company library, ready for every job. Check what has expired 20 min 15 min 0 min Flags expired and expiring papers and names each pack they are in. Enter the details off each certificate 15 min 10 min 2 min Reads the insurer, the cover and the dates off the certificate you add. Collect papers from the firms you engaged 45 min 30 min 5 min Shows what each firm you engaged still owes you. Put the pack together with a contents page 60 min 50 min 2 min Makes one PDF with a contents page and a clear list of what is missing. Send it again when the builder asks 30 min 25 min 2 min Exports the pack again in one press, with a record of each export. Total, each job 230 min 175 min 16 min Set up the next jobeach new jobBy hand3 h 20 minExcel2 h 15 minYourCA13 min3 h 7 min saved · 94% less time
Most of your work comes from the same few builders. Each new job, you type the same site team, the same plans and the same order list again.
The risk it heads off
- A new job starts with the last job’s signatures, dates or prices still on it.Copies come across as fresh drafts, with no signature, photo, date or price.
- The builder’s site manager is missing from the job, so your notice is addressed to the wrong person.The builder’s people from your other jobs are one tick away.
Set up the next job: every step on its own pageSet up the next job: estimated minutes for each step, each new job Step By hand Excel YourCA What YourCA does Add the builder’s people again 30 min 20 min 2 min Same builder as before? Tick their people from your other jobs and add them. Put your own team on the job 20 min 15 min 1 min Copy the team from a past job, each keeping their role there, and they can sign in to it. Copy the order list from a past job 60 min 30 min 3 min Copies each line with its supplier and lead time, still to order, with no old price. Set up the inspection and test plans again 45 min 30 min 3 min Brings the plans across not started, with no signature or photo. Fill in the builder and the site 15 min 10 min 1 min Brings the builder and the site across from the past job. Find the terms you had with this builder before 30 min 30 min 3 min A blank term shows what your last job with this builder had, and its clause. One press uses it. Total, each new job 200 min 135 min 13 min
Run the job
Keep drawings, RFIs and submittalseach month on the jobBy hand24 hExcel19 h 30 minYourCA2 h 48 min21 h saved · 88% less time
The builder runs the drawing set. You keep your own copy of what you were given and what you asked, because an unanswered RFI is your delay and your cost.
The risk it heads off
- An unanswered RFI holds you up and nobody can prove when you asked.Each RFI keeps the date sent and the date the answer was due.
- An RFI answer changes your scope and nobody prices it.An answer that changes the work can go straight to a variation.
Keep drawings, RFIs and submittals: every step on its own pageKeep drawings, RFIs and submittals: estimated minutes for each step, each month on the job Step By hand Excel YourCA What YourCA does File new drawings by revision 45 min 30 min 10 min Groups each sheet with its revisions and shows the current one. File a new drawing pack over the last one 40 min 30 min 2 min Reads each sheet's number, Rev and status off its title block and replaces the last pack in one press. Work out what changed in the new pack 30 min 25 min 1 min Lists every sheet revised, added, unchanged and left out against the last pack. Log and number RFIs 20 min 15 min 3 min Numbers each RFI and locks it once issued. A correction makes a revision. Chase RFIs with no answer 20 min 15 min 2 min Shows which RFIs are overdue and how long each has waited. Record the delay an RFI caused 20 min 20 min 2 min Offers an overdue RFI to the site diary as a delay. Record submittals and responses 30 min 25 min 5 min Records the submission, the response and each revision. Attach the product data sheets to a submittal 20 min 20 min 2 min Pick them from your library. The files are already on file. Put the submittal and its drawings into one PDF 15 min 15 min 1 min One download: your cover page, then every drawing and data sheet sent with it. Total, each month on the job 240 min 195 min 28 min File the builder’s emailseach month on the jobBy hand12 hExcel11 hYourCA2 h 12 min9 h 48 min saved · 82% less time
Instructions, answers and new drawings arrive by email, mixed with everything else. You read each one, decide where it belongs and type the figures into a register.
The risk it heads off
- An instruction buried in an email is never acted on or priced.Each forwarded email proposes the register it belongs in.
- You cannot find the email that proves what you were told.Every forwarded email stays on the job, searchable.
File the builder’s emails: every step on its own pageFile the builder’s emails: estimated minutes for each step, each month on the job Step By hand Excel YourCA What YourCA does Read each email and decide where it belongs 60 min 60 min 15 min Forward it to the job address. YourCA proposes where it belongs. Type the figures and dates into a register 40 min 30 min 5 min Fills the entry with the exact words it read. You check and press to file. Find an email again later 20 min 20 min 2 min Keeps every forwarded email on the job record, searchable. Total, each month on the job 120 min 110 min 22 min File the paper that lands on your deskeach month on the jobBy hand4 hExcel3 h 30 minYourCA24 min3 h 36 min saved · 90% less time
Invoices, certificates of currency, programme revisions and drawings arrive all week. Each one means finding the right screen, opening its form, attaching the file and typing what it says.
The risk it heads off
- An invoice or certificate sits in a downloads folder and never reaches the job.Drop it on any screen and YourCA opens the form that keeps it.
File the paper that lands on your desk: every step on its own pageFile the paper that lands on your desk: estimated minutes for each step, each month on the job Step By hand Excel YourCA What YourCA does Work out where each file belongs 20 min 20 min 2 min Reads the file name and first page on your device and suggests what it is. You check the guess. Open the right form and attach the file 20 min 15 min 2 min Opens that form with the file already on it, on the right job. Total, each month on the job 40 min 35 min 4 min Pull your actions out of meeting minuteseach site meetingBy hand8 h 40 minExcel8 h 14 minYourCA52 min7 h 48 min saved · 90% less time
The minutes arrive the day after the meeting. Your three actions are buried among forty for other trades, and a date you miss is the first thing raised at the next meeting.
The risk it heads off
- An action given to you in the minutes is missed and raised against you at the next meeting.Every action named for your business goes on your list with its date.
Pull your actions out of meeting minutes: every step on its own pagePull your actions out of meeting minutes: estimated minutes for each step, each site meeting Step By hand Excel YourCA What YourCA does Read the minutes for the actions that fall to you 10 min 10 min 1 min Reads only your own actions out of the minutes, with the words each one was read from. Write each action and its date on your list 6 min 5 min 1 min One press adds every action to your action list, with the date printed beside it. Put the dates in the calendar 4 min 4 min 0 min Each action with a date shows on the Calendar and in the brief on the Dash. Total, each site meeting 20 min 19 min 2 min Order the long-lead itemseach month on the jobBy hand22 hExcel16 h 30 minYourCA2 h 12 min19 h 48 min saved · 90% less time
The builder sets the programme. You own the switchboard, the pipe or the doors that must arrive in time for it, and the chase emails when a supplier goes quiet.
The risk it heads off
- Long-lead gear is ordered late and your crew stands idle.Shows the order-by date from the programme and reminds you before it.
- A supplier slips and you hear on the day of delivery.Flags late and at-risk items, with the chase drafted.
Order the long-lead items: every step on its own pageOrder the long-lead items: estimated minutes for each step, each month on the job Step By hand Excel YourCA What YourCA does Work out when each item must be on site 40 min 30 min 3 min Takes each date from the programme activity the item is linked to. Work out the order-by date from the lead time 20 min 10 min 0 min Counts back from the on-site date for you. Find out how long each supplier takes 15 min 10 min 1 min Shows how long the supplier usually takes, from your own past deliveries. Write the chase emails 40 min 35 min 5 min Drafts each chase with the dates and the urgency. It opens in your own email. Write the order to each supplier 30 min 20 min 3 min Writes one order per supplier, every item with its code, quantity, finish and photo, and marks the lines ordered. Enter supplier quotes 30 min 25 min 5 min Reads the supplier quote onto the line. You check it. Record what arrived against each order 20 min 15 min 3 min Receive the delivery line by line, on the desk or on site from the phone, with the docket photo. A line that has all come marks its item delivered. Check each supplier invoice against its order 25 min 20 min 2 min Drop the invoice on its order. It reads the order number and says Matched, or Differs and by how much. Total, each month on the job 220 min 165 min 22 min Read the builder’s programmeeach programme revisionBy hand4 h 15 minExcel4 h 15 minYourCA18 min3 h 57 min saved · 93% less time
The programme is written for the whole job. You need the twenty lines that are yours, and the ones that moved since last month.
The risk it heads off
- Your start moves and you find out when you arrive on site.Shows each activity that moved between programme revisions.
- A squeezed programme is never recorded, so you cannot claim the time.Each change is kept, revision by revision.
Read the builder’s programme: every step on its own pageRead the builder’s programme: estimated minutes for each step, each programme revision Step By hand Excel YourCA What YourCA does Find your trade’s activities 45 min 45 min 3 min Reads the programme, suggests the lines that are your trade and ticks them. You confirm with one press. Find what moved since the last revision 40 min 40 min 3 min Shows what changed between revisions. Total, each programme revision 85 min 85 min 6 min Roster the creweach week, for a crew of tenBy hand28 hExcel23 hYourCA5 h 12 min23 h saved · 82% less time
The builder wants bodies on site. You move the same people between three jobs, and find out at the gate that a ticket ran out.
The risk it heads off
- A worker turns up with an expired ticket and is sent home.The week warns on an expired ticket.
- One person is booked on two jobs on the same day.Shows the clash as you place them.
Roster the crew: every step on its own pageRoster the crew: estimated minutes for each step, each week, for a crew of ten Step By hand Excel YourCA What YourCA does Build next week’s roster 30 min 20 min 10 min Copies last week, then you change what moved. Check nobody is booked twice 10 min 10 min 0 min Shows a clash across jobs as you place someone. Check tickets are current on the day 10 min 8 min 0 min Warns when a ticket expires on a rostered day. Tell the crew which job they are on 15 min 15 min 2 min Publish it. Each worker sees their week on their own phone. Total, each week, for a crew of ten 65 min 53 min 12 min Collect the crew’s hourseach week, for a crew of tenBy hand22 hExcel17 h 19 minYourCA2 h 10 min19 h 29 min saved · 90% less time
Paper hours come back late, rounded and in five handwritings. You check them against a roster in your head before you can pay anyone.
The risk it heads off
- You pay hours nobody worked, or miss hours that were.Shows each clocked hour that differs from the roster.
- You cannot show who was on site when a delay is argued.The hours are kept by day and by job.
Collect the crew’s hours: every step on its own pageCollect the crew’s hours: estimated minutes for each step, each week, for a crew of ten Step By hand Excel YourCA What YourCA does Collect hours from the crew 30 min 25 min 0 min Workers clock on and off on their own phone. Check hours against the roster 20 min 15 min 5 min Shows only the hours that differ from the roster. Total, each week, for a crew of ten 50 min 40 min 5 min Work out gross wages and supereach fortnightly pay, for a crew of tenBy hand21 hExcel10 h 50 minYourCA52 min19 h 42 min saved · 96% less time
You are paying the crew on a construction award, with overtime, allowances and public holidays. The spreadsheet that does it breaks every time the rules change.
The risk it heads off
- Overtime or a public holiday is paid at the wrong rate.Sorts each shift by your rules and the public holiday calendar.
- Pay is worked from the roster, not from the hours worked.Pay starts from the approved hours.
Work out gross wages and super: every step on its own pageWork out gross wages and super: estimated minutes for each step, each fortnightly pay, for a crew of ten Step By hand Excel YourCA What YourCA does Sort each shift into ordinary time and overtime 60 min 30 min 2 min Sorts each shift by your rules, day kind and public holidays. Work out super 15 min 5 min 0 min Works out super on ordinary time. Get the figures into payroll 20 min 15 min 2 min Approve the period, then download an import file for Employment Hero or MYOB, or a sheet for Xero Payroll. Total, each fortnightly pay, for a crew of ten 95 min 50 min 4 min Keep crew tickets currenteach job, for a crew of tenBy hand2 h 20 minExcel1 h 40 minYourCA22 min1 h 58 min saved · 84% less time
Every builder asks for the same tickets. You send the same photos for every job and find out at induction that one has expired.
The risk it heads off
- A worker is refused at induction for an expired ticket.Warns before a ticket expires.
- You cannot show a card when the builder asks.A photo of each card is kept with its expiry.
- A worker turns up without this builder’s induction and is sent home.Prestart, Crew and the roster show who holds a current induction with this builder.
Keep crew tickets current: every step on its own pageKeep crew tickets current: estimated minutes for each step, each job, for a crew of ten Step By hand Excel YourCA What YourCA does Collect cards and expiry dates 30 min 25 min 10 min Records each ticket, its expiry and a photo of the card, once per person. Check expiry before the job 20 min 15 min 0 min Warns before a ticket expires, and on any rostered day after it. Record each builder’s site induction 30 min 20 min 5 min Records the builder, the day and a photo of the card for several people at once. Check who is ready for this job 30 min 20 min 2 min Lists everyone on the job with their White Card, tickets, this builder’s induction and the SWMS signed, and names the gap. Gather details and cards for the builder’s induction 30 min 20 min 5 min Downloads one pack: each person’s details and every card photo, ready for any builder’s induction form. Total, each job, for a crew of ten 140 min 100 min 22 min Give a new employee their paperseach new employeeBy hand1 h 15 minExcel50 minYourCA6 min1 h 9 min saved · 92% less time
You hire a plumber on Friday to start Monday. The letter of offer is last year’s with the name changed, and nobody wrote down whether they got the information statement.
The risk it heads off
- A new employee was never given the Fair Work Information Statement, and you cannot show they were.The pack lists the papers their employment calls for and records the day each was given.
- The letter of offer is last year’s with the old rate or award left in.Each letter starts from your current standard terms, and you set the rate for the person.
Give a new employee their papers: every step on its own pageGive a new employee their papers: estimated minutes for each step, each new employee Step By hand Excel YourCA What YourCA does Work out which papers this person must get 20 min 15 min 1 min Lists the papers their kind of employment calls for, each with where the official form comes from. Write the letter of offer 30 min 20 min 3 min Fills the letter from your standard terms and their record. You type only their position and rate. Put your handbook and policies with it 15 min 10 min 1 min Lists every handbook and policy you keep once, in the pack, with its own tick. Record what they were given and when 10 min 5 min 1 min Records the day each paper was given, and shows who still has a pack to finish. Total, each new employee 75 min 50 min 6 min
On site
Sign off the ITPseach ITPBy hand10 h 40 minExcel9 h 20 minYourCA1 h 40 min9 h saved · 84% less time
The builder needs the hold point signed before the wall closes. You sign paper on site, lose it in the ute and rebuild the ITP at handover.
The risk it heads off
- A hold point is not signed before the wall closes, so it is opened up again.Each hold point is signed on the phone, at the work, with photos.
- The ITP is signed against an old drawing revision.The sign-off records the revision it was signed against.
Sign off the ITPs: every step on its own pageSign off the ITPs: estimated minutes for each step, each ITP Step By hand Excel YourCA What YourCA does Write the ITP 60 min 45 min 10 min Starts from your template. You change what this job needs. Sign hold points on site 20 min 20 min 5 min Sign on the phone, standing at the work. Collect photos and readings as evidence 30 min 30 min 5 min Photos and readings attach to the point as you take them. Raise a non-conformance report 20 min 20 min 3 min Fills the report from the failed point. Export the signed ITP 30 min 25 min 2 min Makes one document with each point, its reading and its signature. Total, each ITP 160 min 140 min 25 min Write the site diaryeach working dayBy hand27 hExcel27 hYourCA4 h 12 min23 h saved · 85% less time
A delay claim or a dispute is won on the diary. You write it from memory at night, or not at all, and the builder’s diary is the one that gets read.
The risk it heads off
- There is no record of the day when a delay or a dispute comes up.Every working day has a record, closed overnight.
- The weather that stopped work is not written down.The weather goes on each day's record.
Write the site diary: every step on its own pageWrite the site diary: estimated minutes for each step, each working day Step By hand Excel YourCA What YourCA does Write up the day 8 min 8 min 2 min Builds the day from crew hours and site records. You add notes. Look up the weather 2 min 2 min 0 min Fills in the weather from the nearest weather station. Record who was on site 3 min 3 min 0 min Comes from the crew’s clock. Total, each working day 13 min 13 min 2 min Make the photo reporteach fortnightBy hand9 h 45 minExcel8 h 40 minYourCA1 h 5 min8 h 40 min saved · 89% less time
The proof of your work is on three phones and a group chat. When the builder disputes it, you scroll for an hour to find one photo.
The risk it heads off
- You have no proof of the work when a question comes up later.Keeps each photo on the job, with its date.
- Work is covered before anyone sees it.Photos go in before the work is closed up, from the phone on site.
Make the photo report: every step on its own pageMake the photo report: estimated minutes for each step, each fortnight Step By hand Excel YourCA What YourCA does Collect photos off the crew’s phones 15 min 15 min 0 min The crew take photos in the app, on the job they are on. Put a photo report together 30 min 25 min 5 min Makes a report on your letterhead, each photo with its date. Total, each fortnight 45 min 40 min 5 min Give notice of a delayeach delayBy hand3 h 45 minExcel3 h 15 minYourCA15 min3 h 30 min saved · 93% less time
The contract gives you a few days to give notice of a delay, or you lose the time and the cost. Nobody on site has the clause in their head.
The risk it heads off
- Notice of a delay goes in late, so you lose the time and the cost.Shows the day notice falls due, and its clause, when you record the delay.
- A delay is recorded on the wrong day and argued later.A delay is recorded on its day, and a closed day freezes it.
Give notice of a delay: every step on its own pageGive notice of a delay: estimated minutes for each step, each delay Step By hand Excel YourCA What YourCA does Find the notice clause and its deadline 20 min 20 min 0 min Shows the day notice falls due and the clause that sets it. Write the delay notice 40 min 35 min 5 min Drafts the notice in Word for you to check and send. Keep a register of delays 15 min 10 min 0 min Lists every delay with its notice date. Total, each delay 75 min 65 min 5 min Record an incidenteach incident or near miss, for a crew of tenBy hand4 h 30 minExcel3 h 45 minYourCA39 min3 h 51 min saved · 86% less time
Your crew, your incident. The builder asks for your report, the insurer asks for it again, and an audit asks for every near miss on the job.
The risk it heads off
- A notifiable incident is not reported straight away.Shows any incident the regulator has not been told about at the top of the register.
- The fix is never written down, and the same thing happens again.An incident closes only on what changes, and an action past its date shows at the top.
Record an incident: every step on its own pageRecord an incident: estimated minutes for each step, each incident or near miss, for a crew of ten Step By hand Excel YourCA What YourCA does Fill in the incident form 30 min 25 min 8 min Asks what happened, who was hurt, the treatment and who was told, on the phone, on the day. File the photos with it 15 min 15 min 2 min Files each photo taken from the record against the incident. Keep the incident register 15 min 10 min 0 min Lists every incident, with any the regulator has not been told about at the top. Write the report for the builder 30 min 25 min 3 min Downloads the report on your letterhead, with lines for your supervisor to sign. Total, each incident or near miss, for a crew of ten 90 min 75 min 13 min Get a dayworks docket signedeach dayworks docketBy hand12 hExcel10 hYourCA1 h 48 min10 h 12 min saved · 85% less time
The site manager asks for extra work on the day. Without their signature that afternoon, the hours are argued over when you claim them.
The risk it heads off
- Extra work is done on a word and never signed, so the hours are argued at the claim.The builder's person signs the docket on your phone the same day, and a docket not signed is marked.
- A signed docket is never priced, and the work is never claimed.Make a variation turns a signed docket into a draft variation dated the day of the work.
Get a dayworks docket signed: every step on its own pageGet a dayworks docket signed: estimated minutes for each step, each dayworks docket Step By hand Excel YourCA What YourCA does Write the docket on site 15 min 12 min 5 min Takes the day, who asked, and each line of labour, plant and materials, with a name from your team. Get it signed by the builder 10 min 10 min 2 min The builder's person signs on your phone with their name and role, and the docket is kept as signed. Keep the dayworks register 10 min 8 min 0 min Lists every docket on the job, with the ones not signed yet marked. Turn it into a variation 25 min 20 min 2 min Makes a draft variation dated the day of the work, with every line in its description, ready to price. Total, each dayworks docket 60 min 50 min 9 min Run a toolbox talkeach toolbox talk, for a crew of tenBy hand18 hExcel16 h 24 minYourCA2 h 24 min15 h 36 min saved · 87% less time
An audit or an incident asks who was at the talk and that they understood it. A paper sheet in the ute is not there when it is asked for.
The risk it heads off
- Nobody can show who was at the talk, so the briefing counts for nothing when it is asked for.Each person signs on their own phone, and the attendance sheet carries every signature and the time.
- Somebody misses the talk and starts work without it.Shows who has not signed on the Dash and in This week.
Run a toolbox talk: every step on its own pageRun a toolbox talk: estimated minutes for each step, each toolbox talk, for a crew of ten Step By hand Excel YourCA What YourCA does Write the talk down 10 min 8 min 4 min Takes the day, who gave it, the topic and what was covered. Get the crew to sign 15 min 15 min 1 min Puts the talk on the phone of everybody on the job, and each person signs it there. Chase who has not signed 10 min 10 min 0 min Shows who has not signed on the Dash and in This week. File the attendance sheet 10 min 8 min 1 min Downloads the sheet with every signature and the time, on your letterhead. Total, each toolbox talk, for a crew of ten 45 min 41 min 6 min Keep the defect listeach defect, from found to closedBy hand10 h 48 minExcel8 h 24 minYourCA1 h 30 min9 h 18 min saved · 86% less time
The builder's walk finds twenty things, the client finds ten more, and every one of them holds back practical completion and your retention.
The risk it heads off
- A defect is fixed but nobody can prove it, so it is argued at handover.A defect is marked fixed or closed only with a photo of the fix.
- A defect sits past its date and holds back practical completion.Shows how many defects are past their fix-by date at the top of the list.
Keep the defect list: every step on its own pageKeep the defect list: estimated minutes for each step, each defect, from found to closed Step By hand Excel YourCA What YourCA does Write the defect down with its photo 10 min 8 min 2 min Takes what is wrong, who found it, who fixes it and by when, with the photo, on the phone at the spot. Mark where it is on the drawing 8 min 8 min 0 min Pins the defect in the zone you pick, so it shows on the drawing and in that room. Close it out with a photo of the fix 8 min 6 min 2 min Asks for a photo of the fix before a defect is marked fixed or closed. Send the builder the list 10 min 6 min 1 min Downloads the list as shown, open, fixed or late, as a PDF, Word or Excel file. Total, each defect, from found to closed 36 min 28 min 5 min See everything in one roomeach area walked with the builderBy hand16 h 12 minExcel13 h 36 minYourCA1 h 36 min14 h 36 min saved · 90% less time
The builder walks a floor with you and asks what is still open in the plant room. The answer is in five registers and a camera roll.
The risk it heads off
- A defect in one room is missed on the builder walk and found at handover.Shows every pinned defect and open point inside the zone, on one list.
See everything in one room: every step on its own pageSee everything in one room: estimated minutes for each step, each area walked with the builder Step By hand Excel YourCA What YourCA does Find what is open in one room 30 min 20 min 2 min Lists every pinned point, defect, incident, question and variation inside the zone you tap. Find the photos for that room 15 min 15 min 1 min Opens each row to the photos filed against it. Mark up a plan of what is where 20 min 20 min 3 min Draws the zone once on your own drawing. The progress plan on a claim uses the same zone. Record a note, defect or incident found in that room 10 min 8 min 1 min Records it from the open zone, already filed to the room, with nothing to pick again. Sign off or close what is open in that room 6 min 5 min 1 min Opens the sign-off or close-out from the row in the zone, without going to its register to find it. Total, each area walked with the builder 81 min 68 min 8 min Keep your tools and plant checkedeach month, shared across your jobsBy hand5 hExcel2 h 50 minYourCA28 min4 h 32 min saved · 91% less time
A lead with an expired tag turns up on site and the builder sends your sparky home. You find out which leads are due by walking the ute.
The risk it heads off
- A lead with an expired tag is found on site and the worker is sent home.Lists every check overdue or due in the next 14 days, and where each item is.
Keep your tools and plant checked: every step on its own pageKeep your tools and plant checked: estimated minutes for each step, each month, shared across your jobs Step By hand Excel YourCA What YourCA does Work out which tools are due for test and tag 40 min 20 min 2 min Lists every check overdue or due in the next 14 days, soonest first. Find where each item is 30 min 20 min 2 min Shows the job or person each item is with now, and every move before it. Record the test and the next due date 30 min 15 min 5 min Records the check in one press and moves the next due day on by your own cycle. Keep rego, service and calibration dates 20 min 10 min 2 min Keeps the rego, insurance, service and calibration dates on the same list as the tags. Check what is on hire against the hire invoice 30 min 20 min 3 min Lists the gear on hire with its firm, the job it is on and the days so far. Total, each month, shared across your jobs 150 min 85 min 14 min
Get paid
Work out the claim dateseach payment claimBy hand4 h 30 minExcel3 h 30 minYourCA0 min4 h 30 min saved · 100% less time
A claim served on the wrong day can lose its protection under the Security of Payment Act. The builder’s team knows the dates. You count them on a calendar.
The risk it heads off
- A claim served on the wrong day loses its protection under the Act.Works out the day your claim is due by from your contract and the Act.
- The payment due date passes and nobody chases it.Reminds you when payment falls due, and again when it is late.
Work out the claim dates: every step on its own pageWork out the claim dates: estimated minutes for each step, each payment claim Step By hand Excel YourCA What YourCA does Work out the reference date and the first day to serve 20 min 15 min 0 min Works it out from your contract and the Act, and shows the clause behind it. Count when the payment schedule and payment fall due 15 min 10 min 0 min Counts business days and public holidays for the job’s state. Set reminders for claim day and late replies 10 min 10 min 0 min Reminds you before claim day and when a reply is late. Total, each payment claim 45 min 35 min 0 min Build the payment claimeach payment claimBy hand18 hExcel13 hYourCA2 h 54 min15 h 6 min saved · 84% less time
The builder assesses claims with a team. You rebuild the same spreadsheet every month, roll the variations in by hand and hope the sums carry.
The risk it heads off
- The builder disputes the per cent you claimed and the claim goes back and forth.Mark the work done on the drawing, and the claim carries the marked-up plan as proof.
- A variation is left off the claim and never paid.Every variation lands on the claim. One not yet agreed shows at nil with its reason.
- Too much retention is held back.Holds retention at the contract rate, up to the cap.
Build the payment claim: every step on its own pageBuild the payment claim: estimated minutes for each step, each payment claim Step By hand Excel YourCA What YourCA does Update the claim schedule with this month’s progress 60 min 40 min 15 min Starts from last month’s claim. You type this month’s progress. Add approved and pending variations 30 min 20 min 0 min Every variation lands on the claim. One not yet agreed shows at nil with its reason. Work out retention to hold back 15 min 10 min 0 min Takes retention off at the contract rate, up to the cap. Write the cover letter and lay out the claim 30 min 20 min 2 min Builds the claim document on your letterhead, every field editable. Sign it 10 min 10 min 1 min Applies your saved signature in one tap. Write the email to the builder and attach the claim 10 min 10 min 1 min Drafts the email in your own mail, addressed to the builder, with the claim saved to attach. Key the claim into the builder’s claims system 25 min 20 min 10 min Lays the claim out line by line in the builder’s order, ready to key in. Total, each payment claim 180 min 130 min 29 min Fill the statement or declarationeach payment claimBy hand8 h 30 minExcel6 h 30 minYourCA42 min7 h 48 min saved · 92% less time
Some builders will not pay a claim without the statement. You find the right form, fill the same boxes every month and chase the firms you engaged for theirs.
The risk it heads off
- The claim is sent back without its statement, and payment slips a month.Drafts the statement beside the claim, so your claim goes out with it attached.
- You declare for firms you engaged that have not given you theirs.Lists what each firm still owes for the period before you sign.
Fill the statement or declaration: every step on its own pageFill the statement or declaration: estimated minutes for each step, each payment claim Step By hand Excel YourCA What YourCA does Find the right form 15 min 15 min 0 min Uses the exact published form for the job’s state. Fill in who, which claim, the job and the period 25 min 20 min 2 min Fills the facts from the claim. Signature, witness and the paid questions stay for you. Check the firms you engaged gave their papers 45 min 30 min 5 min Lists what each firm you engaged still owes for the claim period. Total, each payment claim 85 min 65 min 7 min Check what the builder cuteach short payment scheduleBy hand9 hExcel7 h 45 minYourCA51 min8 h 9 min saved · 91% less time
The schedule comes back lower than the claim. You work out line by line what they cut and why, before the window to respond closes.
The risk it heads off
- The window to apply for adjudication closes while you argue.Shows the last day to act.
- A cut with no reason on the schedule is accepted.Checks the schedule against what the Act requires it to say.
- A backcharge hides in the line items.Shows each deduction in the words used, with the amount.
Check what the builder cut: every step on its own pageCheck what the builder cut: estimated minutes for each step, each short payment schedule Step By hand Excel YourCA What YourCA does Compare the schedule against your claim line by line 60 min 40 min 5 min Reads the schedule in and lines it up against your claim. Write down what they cut and why 30 min 25 min 0 min Keeps each reason in the builder’s own words. Check the schedule and find your last day to act 30 min 30 min 2 min Checks it against the Act and shows the last day to apply for adjudication. Put the papers together for a dispute 60 min 60 min 10 min Collects the claim, the schedule and the reasons in one pack. Total, each short payment schedule 180 min 155 min 17 min Raise the variationeach variationBy hand22 hExcel18 hYourCA2 h 24 min19 h 36 min saved · 89% less time
The site manager tells you to do extra work. If the notice is late, the contract can bar the claim, and the instruction was only ever spoken.
The risk it heads off
- Notice goes in after the contract deadline, so the claim is barred.Shows the deadline and its clause when you record the variation.
- A spoken instruction is remembered differently later.Records it on the day, with photos and who gave it.
- An approved variation never reaches a claim.Every variation lands on the next claim.
Raise the variation: every step on its own pageRaise the variation: estimated minutes for each step, each variation Step By hand Excel YourCA What YourCA does Write down the instruction on site 15 min 15 min 2 min Record it on your phone in thirty seconds, with photos. Find the notice period in the contract 15 min 15 min 0 min Shows the notice deadline and the clause that sets it. Price the variation 30 min 20 min 5 min Add each line from your own rates. The sums are done for you. Write the notice 25 min 20 min 3 min Drafts the notice as Word or PDF for you to send. Write the email that sends it 10 min 10 min 1 min Drafts the email in your own mail, addressed to the builder, with the notice saved to attach. Follow up approval and put it on the claim 15 min 10 min 1 min Shows where each variation stands and puts it on the next claim. Total, each variation 110 min 90 min 12 min Chase a late paymenteach late paymentBy hand5 h 30 minExcel5 hYourCA24 min5 h 6 min saved · 93% less time
When a payment is late, the builder has no reason to write first. You do: a reminder, a firmer letter that names the Act, then notice that you intend to suspend work. Most subbies put it off because each letter is a job.
The risk it heads off
- A late payment is never chased, so the builder pays everyone else first.Drafts each letter on the day it falls due, and puts it in your brief.
- You threaten to suspend work and cite the wrong section, or none.The notice names the suspension section for the job’s state, and leaves it blank rather than guess.
- Nobody can show when you asked to be paid.Each chase you send is recorded on the claim with the day.
Chase a late payment: every step on its own pageChase a late payment: estimated minutes for each step, each late payment Step By hand Excel YourCA What YourCA does Notice the payment is late 10 min 5 min 0 min Puts the chase in your brief on the day it falls due. Write the first reminder 15 min 15 min 2 min Drafts it with the amount, the claim and the due date filled in. You send it from your mail. Write the firmer letter 30 min 30 min 2 min Drafts it with your state’s Act named, from the job’s state. Give notice that you intend to suspend work 45 min 45 min 3 min Drafts the notice with the suspension section for your state filled in. Keep a record of each chase 10 min 5 min 1 min One press records the day you sent it, on the claim. Total, each late payment 110 min 100 min 8 min Get the retention backeach jobBy hand1 h 35 minExcel1 h 15 minYourCA4 min1 h 31 min saved · 96% less time
Retention comes back a year or more after you leave site. The builder holds the sheet. If you forget to ask, it can stay with them.
The risk it heads off
- Retention is never claimed back after you leave site.Works out each release and its date, and reminds you while it is still held.
- The end of the defects period passes without a claim.The second release date sits in your calendar.
Get the retention back: every step on its own pageGet the retention back: estimated minutes for each step, each job Step By hand Excel YourCA What YourCA does Keep a sheet of what is held 30 min 20 min 0 min Builds the retention ledger from your claims. Work out the release dates 20 min 15 min 0 min Reads the release terms from your contract, each with its clause. Remember to claim each release 30 min 30 min 2 min Reminds you a month before, a week before and on the day. Record what came back 15 min 10 min 2 min Records each payment against its release. Total, each job 95 min 75 min 4 min Pay the firms you engaged on timeeach month, on each jobBy hand6 h 30 minExcel4 h 30 minYourCA18 min6 h 12 min saved · 95% less time
The builder has an accounts team for its payables. Your invoices from labour hire and the firms under you sit in an inbox, and the due date is whichever one you noticed.
The risk it heads off
- A firm you engaged is paid late, and it stops work or claims interest.Shows the day to pay each invoice by, and puts it on your Dash and Calendar.
- A payment claim from a firm under you passes with no payment schedule.Shows the last day for a payment schedule on an invoice that is a payment claim.
Pay the firms you engaged on time: every step on its own pagePay the firms you engaged on time: estimated minutes for each step, each month, on each job Step By hand Excel YourCA What YourCA does Type the month’s invoices from the firms you engaged 20 min 15 min 3 min Reads the invoice you drop or forward and fills every value, with the words it came from. You check it. Work out the day to pay each one by 15 min 10 min 0 min Takes the earliest of the invoice’s date, your contract’s and the Act’s, and shows all three. Count the payment schedule date on an invoice that is a payment claim 15 min 10 min 0 min Counts it for the job’s state, or says in one line why there is none. Work out what you owe each firm across every job 15 min 10 min 0 min Shows what you owe each firm, what is overdue and what you paid, firm by firm. Total, each month, on each job 65 min 45 min 3 min
Hand it over
Build the O&M manualeach jobBy hand6 hExcel4 h 45 minYourCA45 min5 h 15 min saved · 88% less time
The O&M pack is due months after you leave site, and the builder can hold your final claim until it arrives. You dig through every folder to build it.
The risk it heads off
- Your final claim is held until the O&M pack arrives.Names every missing document early.
- A supplier's warranty is lost before handover.Shows who still owes each document.
Build the O&M manual: every step on its own pageBuild the O&M manual: estimated minutes for each step, each job Step By hand Excel YourCA What YourCA does Gather documents from every folder 180 min 150 min 30 min Builds the pack from the documents the job already holds. Make the contents page and numbering 60 min 45 min 0 min Makes the contents page and numbers each section. Find what is still missing 60 min 40 min 0 min Names every gap: owed, received with no document, or not filed. Chase the missing documents 60 min 50 min 15 min Shows who still owes each document. Total, each job 360 min 285 min 45 min Fill the handover certificateseach certificateBy hand4 hExcel3 h 45 minYourCA30 min3 h 30 min saved · 88% less time
The certifier sends a long list. You work out which lines are yours, find each form and fill the same details again.
The risk it heads off
- A certificate is missed and practical completion stalls.Lists each certificate owed and who owes it.
- The certificate is filled on the wrong form.Fills the exact published form.
- Your own test certificate is retyped on every job, with last job’s address left on it.Written once in your library, with each job’s details filled in.
Fill the handover certificates: every step on its own pageFill the handover certificates: estimated minutes for each step, each certificate Step By hand Excel YourCA What YourCA does Work out which certificates are yours 30 min 30 min 5 min Suggests the certificates for your trade and matches the certifier’s request. Find the right form 20 min 20 min 0 min Uses the real template or the prescribed form, or your own certificate, written once and kept for every job. Fill it in 30 min 25 min 5 min Drafts it from the job record with the signature blank. Total, each certificate 80 min 75 min 10 min Keep the penetration registereach job that seals penetrationsBy hand5 hExcel3 h 45 minYourCA42 min4 h 18 min saved · 86% less time
Every penetration you seal needs a line on the schedule at handover. Rebuilt from photos at the end, it takes days.
The risk it heads off
- The fire seal certificate cannot issue without a schedule of every penetration.The schedule builds as you seal each penetration, with a photo.
- A penetration is closed up with no photo.The photo is taken at the seal, from the phone.
Keep the penetration register: every step on its own pageKeep the penetration register: estimated minutes for each step, each job that seals penetrations Step By hand Excel YourCA What YourCA does Keep a register of each penetration 240 min 180 min 40 min Log each one as you go, in the template’s own columns. Make the schedule for the certificate 60 min 45 min 2 min The schedule is ready. The certificate waits until it has lines. Total, each job that seals penetrations 300 min 225 min 42 min
Every day, every job
Know what needs you todayeach working day, shared across your jobsBy hand7 hExcel5 h 36 minYourCA1 h 24 min5 h 36 min saved · 80% less time
The builder has a team for each job. You are the team for all of yours, and the thing you forget is the date that costs you.
The risk it heads off
- The one date you forgot is the one that costs you.Puts every job’s dates in one list, most urgent first.
Know what needs you today: every step on its own pageKnow what needs you today: estimated minutes for each step, each working day, shared across your jobs Step By hand Excel YourCA What YourCA does Check every job for what needs you 10 min 8 min 2 min Puts what is waiting on you in one list, most urgent first. Total, each working day, shared across your jobs 10 min 8 min 2 min Keep every date in your calendareach week, shared across your jobsBy hand2 h 53 minExcel2 h 10 minYourCA9 min2 h 44 min saved · 95% less time
Each job has its own dates in its own contract. You copy them into a calendar by hand and miss the one that moved.
The risk it heads off
- A date that moved is still wrong in your own calendar.Your own calendar follows when a date changes.
Keep every date in your calendar: every step on its own pageKeep every date in your calendar: estimated minutes for each step, each week, shared across your jobs Step By hand Excel YourCA What YourCA does Copy job dates into your own calendar 20 min 15 min 1 min Subscribe once. Dates flow to your own calendar and move when they change. Total, each week, shared across your jobs 20 min 15 min 1 min Know who owes youeach week, shared across your jobsBy hand7 h 56 minExcel7 h 13 minYourCA0 min7 h 56 min saved · 100% less time
Your cash sits with the builders. You work out who owes what from bank statements and claims, and chase the oldest when you remember.
The risk it heads off
- A debt goes stale before you chase it.Shows who owes what, and how late.
- Work stops being claimable while you are busy.Shows the value behind deadlines that close soon.
- You price a new job for a builder who pays late.Shows how each builder has paid you before.
Know who owes you: every step on its own pageKnow who owes you: estimated minutes for each step, each week, shared across your jobs Step By hand Excel YourCA What YourCA does Work out who owes what and how late 20 min 15 min 0 min Shows aged debtors by builder, from your own claims and payments. Find what stops being claimable soon 20 min 20 min 0 min Shows the value behind deadlines that close soon, with the clause. Check how each builder pays 15 min 15 min 0 min Shows how each builder pays, from your own history with them. Total, each week, shared across your jobs 55 min 50 min 0 min Know your margin on each jobeach month, on each jobBy hand12 hExcel7 h 30 minYourCA18 min11 h 42 min saved · 98% less time
The builder knows its margin on your package. You find out yours at tax time, from a spreadsheet of hours and invoices.
The risk it heads off
- A job runs at a loss and you find out after it ends.Shows the margin on every job while it runs.
- Unpriced hours or orders make a job look better than it is.Names each shift with no rate and each order with no price.
- One cost line runs over budget and nobody sees it until the job is done.Shows each budget line against what it has cost, in red once it is over.
Know your margin on each job: every step on its own pageKnow your margin on each job: estimated minutes for each step, each month, on each job Step By hand Excel YourCA What YourCA does Add up the labour cost from the hours worked 45 min 30 min 0 min Costs every recorded hour at the rate on that day, with super on wages. Add up what you ordered for the job 30 min 20 min 0 min Adds the price of every item ordered in Procurement. Take the costs off what you claimed 15 min 10 min 2 min Shows the margin and each line behind it. You check the gaps it names. Check each cost line against the job budget 30 min 15 min 1 min Shows each budget line against what it has cost, and which line is over. Total, each month, on each job 120 min 75 min 3 min Send the bank your WIP scheduleeach month, on each jobBy hand14 h 30 minExcel9 hYourCA12 min14 h 18 min saved · 99% less time
The bank, the surety and your accountant ask for a WIP schedule every month. You build it in a spreadsheet from four other spreadsheets.
The risk it heads off
- A job is over claimed and the bank or surety finds it before you do.Shows each job over or under claimed, with over in red, every time you open it.
- The figures you gave the bank last month cannot be produced again.Keeps a snapshot of each month, saved by you or by YourCA at month end.
Send the bank your WIP schedule: every step on its own pageSend the bank your WIP schedule: estimated minutes for each step, each month, on each job Step By hand Excel YourCA What YourCA does Pull each job’s contract value and approved variations 30 min 20 min 0 min Reads the contract sum and every approved variation, and shows pending ones beside it. Pull each job’s cost to date and budget 45 min 30 min 0 min Reads the same costs and budget as Margin: labour, super, orders, supplier invoices and typed costs. Work out percentage complete, earned and over or under claimed 40 min 20 min 0 min Works each one out by cost, the method named on the page. Lay it out for the bank and keep the month 30 min 20 min 2 min Downloads it on your letterhead with a cover, and keeps a snapshot of each month. Total, each month, on each job 145 min 90 min 2 min
Estimate up to: Every day, every job
391 hours saved
= A$33,275
How we counted
- Where do the minutes come from?
- Each figure is an estimate of how long each task takes a commercial subcontractor with no contracts administrator, based on real construction experience.
- What does by hand mean?
- Paper, Word, email and the photos on your phone. Excel means the same work with a spreadsheet you keep up yourself.
- What is left for me to do in YourCA?
- Reading, checking and pressing. You still decide, sign and send every document yourself. YourCA never sends anything to the builder for you.
- Why does the crew size change the figure?
- Rostering, hours and pay take longer for every person on the job. Work you do once for the whole business, such as checking who owes you, is shared across the jobs you run.
- Does the figure count losses you avoid?
- No. A variation that is not barred or a claim served on the right day is worth far more than the hours, but it is not counted here.
Get the hours back on your next job
Your first job is free. See what YourCA runs or read the Guide first.