Time saved / Write the SWMS

SWMS for subcontractors, drafted from your own words

Write a safe work method statement from a few lines about the task: steps, hazards, controls, risk ratings and the high risk work questions, ready to sign.

The builder asks for a SWMS before you start. You write it from a blank template for every job, then the crew signs it on paper.

83%
By hand
11 h 20 min
In Excel
9 h 40 min
In YourCA
1 h 58 min
Saved
9 h 22 min

Estimate for a 6-month electrical job with 10 people on it, each SWMS. Set your own job.

The risk it heads off

  • The safety officer sends your SWMS back and the crew waits at the gate.Each high risk task must be answered, and the risk ratings stay consistent page to page.
  • A rating drops two bands on the strength of a hard hat.Warns when the controls do not support the lower rating.

Step by step

Write the SWMS: estimated minutes for each step, each SWMS
StepBy handExcelYourCAWhat YourCA does
Write the steps, hazards and controls180 min150 min30 minType the tasks in your own words. YourCA drafts the steps, hazards and controls.
Rate each risk20 min20 min5 minRates each one on the risk matrix as you pick likelihood and consequence.
Check the high risk work categories15 min15 min3 minAsks each high risk question. The statement cannot be issued while one is open.
Start the next job from this one60 min45 min5 minCopies a past SWMS or fills in your SWMS template. Job facts start blank.
Fill the site, supervisor and emergency details15 min10 min1 minFills them from the job team and the builder’s contact. You check them.
Write the rescue plan20 min20 min5 minDrafts it for the harness, trench or confined space work in your tasks. You fit it to the gear on site.
Collect crew sign-on30 min30 min10 minRecords how each worker signed, on the phone or on paper.
Total, each SWMS340 min290 min59 min

How to do it in YourCA

Questions subbies ask

Can I use the SWMS I already have?
Yes. Upload it and YourCA reads it into steps and hazards. You can also keep your own SWMS as a template in the company library.
Who is responsible for the SWMS?
You are. YourCA drafts it, and you check it, change it and sign it.

Get the hours back on your next job

Your first job is free. See what YourCA runs or every function’s time saved.

Start free