Time saved / Sign off the ITPs
Inspection and test plans signed on site, on a phone
Start an ITP from your template, sign hold points at the wall, attach photos and readings, raise an NCR from a failed point and export the signed ITP.
The builder needs the hold point signed before the wall closes. You sign paper on site, lose it in the ute and rebuild the ITP at handover.
- By hand
- 10 h 40 min
- In Excel
- 9 h 20 min
- In YourCA
- 1 h 40 min
- Saved
- 9 h
Estimate for a 6-month electrical job with 10 people on it, each ITP. Set your own job.
The risk it heads off
- A hold point is not signed before the wall closes, so it is opened up again.Each hold point is signed on the phone, at the work, with photos.
- The ITP is signed against an old drawing revision.The sign-off records the revision it was signed against.
Step by step
| Step | By hand | Excel | YourCA | What YourCA does |
|---|---|---|---|---|
| Write the ITP | 60 min | 45 min | 10 min | Starts from your template. You change what this job needs. |
| Sign hold points on site | 20 min | 20 min | 5 min | Sign on the phone, standing at the work. |
| Collect photos and readings as evidence | 30 min | 30 min | 5 min | Photos and readings attach to the point as you take them. |
| Raise a non-conformance report | 20 min | 20 min | 3 min | Fills the report from the failed point. |
| Export the signed ITP | 30 min | 25 min | 2 min | Makes one document with each point, its reading and its signature. |
| Total, each ITP | 160 min | 140 min | 25 min |
How to do it in YourCA
Questions subbies ask
- Can the builder sign a point on paper?
- Yes. The export says which signatures were given in the app, which on paper and which are still owed.
Get the hours back on your next job
Your first job is free. See what YourCA runs or every function’s time saved.
Start free