Time saved / Keep drawings, RFIs and submittals

RFI register and drawing register for subcontractors

File drawings by revision, number and chase RFIs, record submittals and turn an overdue RFI into a delay record, without a spreadsheet to keep up.

The builder runs the drawing set. You keep your own copy of what you were given and what you asked, because an unanswered RFI is your delay and your cost.

88%
By hand
24 h
In Excel
19 h 30 min
In YourCA
2 h 48 min
Saved
21 h

Estimate for a 6-month electrical job with 10 people on it, each month on the job. Set your own job.

The risk it heads off

  • An unanswered RFI holds you up and nobody can prove when you asked.Each RFI keeps the date sent and the date the answer was due.
  • An RFI answer changes your scope and nobody prices it.An answer that changes the work can go straight to a variation.

Step by step

Keep drawings, RFIs and submittals: estimated minutes for each step, each month on the job
StepBy handExcelYourCAWhat YourCA does
File new drawings by revision45 min30 min10 minGroups each sheet with its revisions and shows the current one.
File a new drawing pack over the last one40 min30 min2 minReads each sheet's number, Rev and status off its title block and replaces the last pack in one press.
Work out what changed in the new pack30 min25 min1 minLists every sheet revised, added, unchanged and left out against the last pack.
Log and number RFIs20 min15 min3 minNumbers each RFI and locks it once issued. A correction makes a revision.
Chase RFIs with no answer20 min15 min2 minShows which RFIs are overdue and how long each has waited.
Record the delay an RFI caused20 min20 min2 minOffers an overdue RFI to the site diary as a delay.
Record submittals and responses30 min25 min5 minRecords the submission, the response and each revision.
Attach the product data sheets to a submittal20 min20 min2 minPick them from your library. The files are already on file.
Put the submittal and its drawings into one PDF15 min15 min1 minOne download: your cover page, then every drawing and data sheet sent with it.
Total, each month on the job240 min195 min28 min

How to do it in YourCA

Questions subbies ask

Can I change an RFI after I issue it?
You raise a revision. The issued RFI stays as it was sent, so the record is true.