How do I add another tender walk board?
- Open the Quote tab and pick Tender walk in its band.
- Press "..." in the tool row, then Add a board for an empty board, or Copy this board to start from the one open, with its notes, drawings and marks.
- Once there are two boards, the Board pick shows before Notes. Each board in it says who started it and when it last changed. Pick one to open it.
- A board is named Board 1, Board 2 and so on. To give it your own name, press "..." and Edit the board name; clear the name to go back to its number.
- To take a board off, press "..." and Remove this board. Undo puts it back with all it held. Remove shows only once there are two boards, so a tender always keeps one.
- Download gives the open board, with its name on the document once there are two or more.
Worth knowing
Every board locks when the walk does: once a quote on the job is accepted and no draft is left. A board is not tied to a quote revision, and the Takeoff keeps its own drawings apart from every board.